Required Documents

Building permits require specific types of documents to be submitted during application. Additional documents may be required during or at the end of construction.

Submitted documents are evaluated by plan reviewers for code compliance. They are reviewed by one or more disciplines, depending on the project: Building, Land Development, Planning & Zoning, and Fire
Marshal divisions.

On our website, a guide called Building Permit Submittal Requirements lists document requirements for each type of permit. Generally, these documents fall into the following categories: Application Documents, Drawings, Specifications, and Related Documents.

Application Documents

An application form is no longer used to apply for a permit; all information is entered on the CSS Portal.

  • Related documents may be required, such as:
    Authorized Permit Agent Affidavit and photo ID
    Homeowner-Builder Affidavit, photo ID, and Proof of Ownership
    Engineer’s Certification for Retaining Wall
    Property Owner’s Certification for Retaining Wall
    Copy of Variance or Land Use Petition granted
    Photos of existing conditions
    Other miscellaneous documents supporting the application

Note: Contractors register their credentials in the CSS Portal under Contractor Registration. The registration is valid until the related licenses expire.

Architectural Drawings

Architectural plans show the layout and aesthetics of a proposed project. They include details regarding:

  • Floor plans – existing and proposed layouts
  • Scope of demolition, for alterations
  • Life safety and occupancy information
  • Elevations
  • Sections and details
  • Material schedules

MEP Plans:

Mechanical plans show the mechanical layout and equipment that will be installed. These plans show:

  • Heating and cooling, water heater
  • Ventilation systems
  • Kitchen equipment
  • Smoke control/evacuation systems
  • Duct layouts
  • Manual J and Manual S Calculations

Electrical plans show electrical components that will be installed for a project. These plans show:

  • Electrical fixtures
  • Lights, switches, and outlets
  • Electrical service panel
  • Transformers and switch gears

Plumbing plans provide water, waste, and gas piping plans. They show the following layouts and information:

  • Riser diagrams
  • Plumbing floor plans and fixtures, water heater
  • Hydraulic calculations
  • Water, waste, grease, fire sprinkler, and greywater systems

Structural Plans

Structural plans provide information about the overall engineering of a building. They include the following information for plan reviewers to evaluate:

  • Connections and anchorage
  • Beams, spans, columns, footings, and slabs/foundations
  • Floor, ceiling, roof, and wall components
  • Sealed truss layouts and calculations
  • Structural calculations (support documents for the drawings)

Site Plans

Submit all site plans combined into one PDF file. Follow the File Format & Naming Requirements. Site plans are specific to the exterior of the lot and show the following information:

  • Conditions, structures, and impervious surfaces – existing and proposed
  • Property lines, setbacks, and right-of-way
  • Grading and land disturbance areas
  • Water retention and drainage
  • Easements, stream buffers, and flood plain information, if applicable
  • Erosion control and tree protection measures
  • Impervious surface calculations
  • Landscaping and trees

See Site Plan Requirements for detailed guidance.

Specifications

Some permits require supplemental specifications, such as:

  • Engineering calculations (sealed by registered engineer)
  • Manual J & S calculations
  • Cell tower and solar panel equipment specifications
  • Manufacturer’s specifications and/or installation requirements, when required

Related Documents

  • Third-party inspection reports
  • Special Inspection reports
  • As-built survey
  • Permit Revision Application
  • Change of Contractor Notification
  • Permit Renewal or Extension Application
  • Certificate of Occupancy/Completion Application